| Welcome to Lamb Construction Specialists, LLC | ||
|
POLE BUILDINGS |
||
| HOME
PROJECTS |
||
| Footer Pad: Concrete Pad Below Grade | Drip Edge: metal edge above fascia to direct water away from building | |
| Treated Posts: 4x4 or 4x6 or 6x6 | Soffet: Boxed in under trusses (can be vented) | |
| Kickboard: 2x8 ground contact treated board | Fascia: End Board on trusses (can be wrapped with metal) | |
| Girt: 2x4 usually 24" on center | ||
| Wall Sheeting: OSB, Plywood, or T1-11 | ||
| Header: 2x10 Inside and Out to hold Trusses | ||
| Truss: Structure Part of Roof | ||
| Roof Sheeting: OSB or Plywood | ||
| Felt Paper: Underlayment on top of sheeting | ||
| Shingles: Weather protection for roof | ||
|
|
||
|
|
![]() |
|
| LAMB
Construction, LLC and/or LAMB Construction Specialists, LLC are not
responsible for written errors. Pictures and prices
are for illustration purposes only and can be changed without notice. No pictures are to be copied or used without the written permission of LAMB Construction, LLC and/or LAMB Construction Specialists, LLC (c) 2006-2010 LAMB Construction Specialists, LLC PO Box 37 Louisville, Ohio 44641 330-875-4422 866-499-5262 330-875-2861 fax |
||